top of page

Entry Rock

This is a proposed rendering of the view as you first enter the  Mazama intersection.

The rock  was installed in the fall of 2021, and landscaping is scheduled for summer of 2022.

Elements to be completed at the entry rock:

  • A single directional pole sign identifying parking area (optional)

  • Native landscaping with limited irrigation

  • Rock accents native from Goat Wall

  • Mazama sign

  • Large tree placement in back ground

christmas sign.jpg

   Winter  

  • Power for low key lighting

  • Seasonal decoration

christmas night sign.JPG
bottom of page